References to electrical power supply

Following is a list of projects in which we had a considerable share:

Transformer station Technical Optics, Lessingstrasse in Jena
Planning services for the modernisation of a transformer station consisting of a 10-kV medium voltage switchgear, low voltage switchgear, modernisation of the general electrical installation, deconcentration of the internal grid
Complete DIN- VDE-equitable modernisation of the transformer station

Transformer station "Froebelstieg" in Jena
Planning services for the modernisation of a transformer station, consisting of 10-kV medium voltage switchgear, low voltage switchgear, modernisation of the general electrical installation
Complete DIN VDE-equitable modernisation of the transformer station

Transformer station "Am Steiger" in Jena
Planning services for the modernisation of a transformer station, consisting of 10-kV medium voltage switchgear, low voltage switchgear, modernisation of the general electrical installation
Complete DIN VDE-equitable modernisation of the transformer station

Transformer station Pruessingstrasse 41, Building 10 in Jena
Project planning of the electrical system, consisting of medium- and low- voltage switchgears for 1.6 MW, as well as planning and coordinating of the associated works to install the transfer- and transformer station and a supply line at the building façade to the 1st upper floor
Preparation of the final planning documents, bill of quantities, taking the lead in negotiation discussions and construction supervision.
Work phases 2 to 8 according HOAI

Transformer station Helmholtzweg 5 in Jena
Planning of the electrical trade for the modernisation of a transformer station
Complete DIN VDE-equitable modernisation of the transformer station, consisting of 10-kV medium voltage system and low voltage system; modernisation of the general electrical installation, Provisional supply of the building during the reconstruction period
Work phases 2 to 8 according to HOAI

Hospital of the Friedrich-Schiller-University of Jena
Redevelopment of the central electrical installation, including the basic grids for the Institutes at Eichplatz
Planning of the electrical system
Power current including medium voltage switchgear, transformer station and basic grid to the main distribution board, installation of the emergency power generator

Supply of the residential area Himmelreich in Jena
Preparation of the implementation planning documents and bill of quantities for a construction phase for the supply of the residential area Himmelreich in Jena, compiling the energy needs calculation for the service area of the transformer station Himmelreich 2, incorporation of the supply demands for other construction phases within the implementation planning, production and coordination of preliminary works for the civil engineering office
Work phases 2 to 6 according to HOAI

Customised transformer station FiberCore Jena GmbH
Planning of a customised transformer station, integration into the newly structured medium voltage loop of the Municipal Energy Supplier Jena, supply of two transformers, each with 630 kVA
Work phases 1 to 6 according to HOAI

Planning of the Municipal Energy Supplier Jena medium / low voltage installation at Goeschwitzer Strasse 20 in Jena
Development of a medium voltage concept for the supply of the site SICO Jena GmbH, planning of the Municipal Energy Supplier Jena part for the supply of customer transformer stations from the resulting medium voltage loop
Production of an energy needs calculation for the use of the Municipal Energy Supplier Jena station
Execution of the route planning for the medium- and low voltage lines, obtaining approval for the siting of the Municipal Energy Supplier Jena station
Work phases 1 to 6 according to HOAI

Planning of a medium voltage switchgear (customer part) in the building 41 Schott ML Jena GmbH
Planning of a customised transformer station, integration of this switchgear into the restructured medium voltage loop of the Municipal Energy Supplier Jena, supply of 4 transformers with 1,000 kVA each
Work phases 1 to 9 according to HOAI

Deconcentration of a medium / low voltage- and telecommunication supply in the building 41 Schott ML GmbH Jena
Planning of the deconcentration of the power supply in the building 41, relocation of all outlets not belonging to Schott ML, compiling of a provisional solution to a continuous operation of hot-plug in consumer outlets
Deconcentration and relocation of the telephone network
Coordination with the municipal energy supplier Jena GmbH
Technical supervision of the construction

Medium / low voltage grid design in building 41 Schott ML Jena GmbH
Concept development of the power supply grid for Schott ML building 41
Disassembly of the existing branch supplies, preparation of the integration into a loop of the Municipal Energy Supplier Jena, securing an uninterrupted power supply of Schott ML, coordination of all the necessary agreements with the previous owner and the municipal energy supplier Jena GmbH

Clearing at Station 3 SICO Jena GmbH
Planning and supervision of preliminary works and interim solutions for the construction of a medium/ low voltage switchgear at the site of the station SL 3, securing a continuous power supply of all concerned customers
Work phases 1-8 according to HOAI

Power supply SICO Jena GmbH
Rearrangement of the medium voltage grid and development of the customized transformer stations
New structure agreement of the low voltage grid and planning of the needed low voltage installation
Coordination of the emergency power supply
Work phases 2 to 8 according to HOAI

Relocation of a transformer station, IMB new building Jena
Demolition and a new construction of a transformer station
reutilisation of the medium voltage switchgear, the transformers and low voltage switchgear
Supply of the existing low voltage instalation
Total reconstruction during continuous power supply

Develoment of Damenviertel Jena
Reconstruction of the low voltage power supply according to current and future requirements
Development of a supply concept and integration into the existing medium voltage grid
Planning and coordination of needed transformer stations
Modernisation of the low voltage grid up to the house connections
Work phases 1 to 4 and work phase 6 (partially) according to HOAI

Transformer station Damaschkeweg
Changeover of the low voltage supply in Damaschkeweg from the existing to a newly built transformer station
Supply of all previously connected customers

Customised 10/20-kV-Station "Building 10 industrial area Goeschwitz"
Plant system Driescher with two outlets AL 900 at the building of the customer
(customised medium voltage grid)

Customised 10/20-kV-Station "Fa. GOT "
Plant system Driescher with 1 x 1,600 kVA

Customised 10/20-kV-Station "Jenaer Leiterplatten GmbH"
Plant system Driescher in customised body shell

Customised 10/20-kV-Station "SB Markt Burgau"
Plant system Concordia Sprecher in 2742 UF

Shared 10/20-kV-Station "Hall 1 Goeschwitz"
Plant system Driescher with the supply of special contract customers

Municipal Energy Supplier Jena –Station, 10-kV-Station Otto-Schott-Strasse
1.26 MW UF 3048 with major customer supply

Municipal Energy Supplier Jena -Stations in the industrial area Saalepark
10/20-kV-Stations, Municipal Energy Supplier Jena- part and customers part with downstream low voltage grid

Municipal Energy Supplier Jena stations in the industrial area Tatzendpromenade
10/20-kV-Stations in separate body shells and as mounting stations

Municipal Energy Supplier Jena stations in the industrial area Goeschwitz
10/20-kV-Stations GWPG 1, GWPG 2, GWPG 3 and GWPG 5
body shell UF 2742

10/20-kV-cable loop in the industrial area Tatzendpromenade
Cable loop in the southern and northern area
New supply to the city centre