References for Electric Project Planning and Execution Planning

Following is a list of projects in which we had a considerable share:

JENOPTIK AG – New construction of day-care-centre Goeschwitz
A building for the use as a day-care-centre was newly constructed within the scope of the construction at the business park in Goeschwitz. The separated building consists of a single floor (ground floor) and is without cellar.
For this contract the project planning for the complete high voltage- and low voltage current installation, including the lightning protection- and Earthing system were provided.

Fire brigade station Jena – Control centre with Control and communication system
Planning services for electrical engineering trade (high voltage- and low voltage current)
Complete extension, upgrade and implementing of the existing monitoring-and switchboard system
Work phases 2 to 9 according to the Fee Structure for Architects and Engineers (HOAI)

Reconstruction City Museum „Alte Goehre“ Jena
Provision of planning services for electrical installation including telecommunication system, closed-circuit TV, fire- and intruder alarm-, smoke and heat exhaustion system, intercom, lighting, emergency lighting, lightning protection for the listed historic building, including professional site management

Bridge over Saale river in Burgau
Compiling of planning documents for the lighting of the bridge over the Saale River

Street lighting at southern connection industrial park Goeschwitz
Planning services for street lighting, work phases 1 to 8 according to the Fee Structure for Architects and Engineers (HOAI)

Goethe-Gallery Jena
Preparing the electric project planning documents for the lighting engineering

New construction of Packaging- and Logistics centre Octapharma GmbH in Dessau
On the premises of the company Octapharma GmbH a new packaging- and logistics centre with offices and welfare rooms, with the components production, storage and management were constructed. A car park for the employees was built on the outdoor facilities
Planning services for the trade electrical installation were rendered.

Student Union Thuringia – Day-care-centre „Studentenfloehe“in Ilmenau
The ground floor in the building Max-Planck-Ring 7 in Ilmenau was reconstructed on behalf of the Student Union Thuringia. The ground floor is used as a day-care-centre after the reconstruction. For it a kitchen, group rooms, a multipurpose room, storage as well as toilets, aisles and stairs are available.
For it planning services in work phases 2 to 8 were provided.

Friedrich-Schiller-University Jena – Fit-out of Laboratory for Quantum electronics
The ground and second floors of the building Max-Wien-Platz 1 were rebuilt for the installation of a laboratory for quantum electronics.
For it planning services (high voltage- and low voltage current) in work phases 2 to 8 were provided.

Friedrich-Schiller-University Jena – Rebuilding and Reconstruction of building „Zur Rosen“, Jena
In connection with the rebuilding, modernisation and reconstruction of the building, the electric installation, high voltage- and low voltage current has been renewed.
Planning services in work phases 1 to 8 according to the Fee Structure for Architects and Engineers (HOAI) were provided

Judiciary Centre Gera
In Gera, Schlossstrasse 26, the existing office buildings were reconstructed and modernised and converted into a Judiciary Centre. The electrical installation has been completely renewed.
For this project the planning services according to work phases 1 to 9, HOAI were realised.

New construction Service- and Office building DAKO GmbH in Jena
This project contains the planning services for the entire electrical trade, including the planning services for lift technologies, work phases 2 to 8 according to HOAI

Rebuilding and Reconstruction of Office building in Stuttgart, Marienstrasse 41
Preparation of planning services for the electrical trade. It included the design- and approval planning,
implementation planning with bill of quantities and the site supervision.

Friedrich-Schiller-University Jena – Reconstruction principal office, lighting
Selected parts of the lighting at the principal’s office have been adjusted in line with the reconstruction project.
For it the planning services for the necessary electrical installations, work phases 3 to 8 according to HOAI were provided.

City Eisenberg – Reconstruction of Robert’s Mill, Kursdorf
The electrical installation in the Robert’s Mill has been completely renewed; the house service connection, the metering for the different occupants as well as the distribution boards is included.
For the entire electrical installation the planning in the work phases 2 to 8 according to HOAI was provided.

Friedrich-Schiller-University Jena - Reconstruction Laboratories Pharmaceutical Technology
To accommodate the field of Pharmaceutical Technology in Helmholtzweg 4 in Jena, areas of the ground floor and basement were reconstructed. The project included the fit-out of several offices, laboratory- and work surfaces, an isotope laboratory as well as the hallway and storage areas.
Planning services for the necessary electrical installations of the phases 2 to 8 according HOAI were provided

Friedrich-Schiller University of Jena - Facility Microbiological Laboratory
On the ground floor of the building Froebelstieg 3 in Jena a S1-laboratory was constructed.
Provision of planning services for the trade electrical installation work phases 2, 3 and 5 to 8 according to HOAI

Jena Drive Engineering – 1st construction stage: "Enlargement Mechatronics hall"
For the Mechatronics hall the electrical installation including lighting and security lighting was renewed. Furthermore connection to the existing burglar alarm system and the existing data network was made. The house service connections were modified.
For it the planning services in the work phases 2 to 8 were realized.

Fraunhofer Institute for Applied Optics and Precision Engineering - Rebuilding of Clean rooms
Planning for the Electrical Engineering trade (high- and low voltage current) for the construction of clean rooms of the Class 1. The reconstruction of the existing clean rooms was done during clean room operation.
Preparation of implementation planning, compilation of the bill of quantities

Municipal real estate Jena - Renovation and extension of the Jena Lobdeburg-school
Within the construction scheme the building Lobdeburg-school in Jena was basically redeveloped and extended. The construction scheme was divided into the existing school building, the newly built extension and the sports hall. The sports hall will at a later date be redeveloped alternatively demolished and rebuild as a 2-fields-hall. For it the service connections for electricity supply, telecommunication and building control is to be planned.
The scope of works in the electrical installation includes the disconnection and dismantling of the existing electrical system and the renewal of the complete high- and low voltage current system.
For it the planning in the work phases 2-9 after HOAI was provided.

Municipal real estate Jena - Extension to South Fire Brigade Station in Jena-Goeschwitz
The building of the south fire brigade station was extended. The new building is a free-standing building and consists of the ground floor and first floor without basement. The upper floor is on 3 sides recessed compared to the ground floor, so that at a later date an extension of the second floor is possible. The planning included that.
For the complete electrical system, the planning services in the work phases 2 to 9 were provided

Water-axis Jena Winzerla
For the reconstruction of the water-axis Winzerla, sub zone city-balcony, the electrical system in work phases 3 to 8 after HOAI was planned.

Friedrich-Schiller University of Jena - Establishment of the Laboratory for Nonlinear Optics
In the building Max-Wien-Platz 1, a new laser laboratory was put into operation. Planning services in the work phases 2 to 8 after HOAI for the installation of the complete electrical system were provided.

Municipal real estate Jena - Passive data network "Neue Goehre" Jena
Planning services to connect the city museum "Neue Goehre" to the data / telecommunication network of the city of Jena.

Reconstruction, rehabilitation and partial construction of Police station and Criminal Investigation Department in Weimar
The 5-storey building was completely renovated and extended with one new part. A passenger lift was installed. The planning services for the installation of the entire electrical system, high- and low voltage current, in the work phases from 2 to 8 after HOAI were provided.

Construction Empire Riverside Hotel Hamburg
For the construction of the hotel services in the work phases 6 to 8 after HOAI were provided for the electrical installation by our office.

Fraunhofer Institute in Jena - Study
Drafting of a study "instability of a low voltage network during mains replacement operation

Friedrich-Schiller University of Jena – Construction of Institute-building Zwaetzengasse 4 in Jena
Within this project an older building was demolished and then rebuilt. The new building has a basement and is accessible by a staircase. It consists of the basement, the ground floor, 1st and 2nd upper floors and a reconstructed loft
The scope of planning works for the electrical engineering included the complete electrical system in TT-network, a fire alarm system and a structured network.
For it the planning services in the work phases from 2 to 8 after HOAI were provided.

FSU Jena University Hospital - Fire protection measures at Holzmarkt-Institutes
Planning services for the rehabilitation of the central electrical installation, including basic network, relocation of the main switch boards in the Institutes of Anatomy and Physiology
Preparation of the ??-building, formulation of the practical plan in the work phases from 1 to 8 after HOAI

Student Union Thuringia
Complete restoration of the student residences Karl-Marx-Allee 3 and 5 in Jena

Within the project the existing buildings were basically rehabilitated. The buildings consist of the basement, the ground floor and the 1st till 10h upper floors.
The scope of planning works for the electrical installation included the installation of the complete electrical system in the TT- network, including a star-shaped telephone, broadband cable- and a data network with connection to the backbone-network of the Friedrich-Schiller University of Jena. Each room received a data-, a broadband- and a telephone connection.
For this project the planning services of the work phases 2 to 8 according to HOAI were provided.

Jena University Hospital - Construction of a Centre for Palliative Medicine
Within this project a centre for Palliative Medicine was erected on the premises of the Jena University Hospital.
Planning services for the electrical installation trade, high- and low voltage current technology were rendered. It included the preparation of the HU-construction, design planning, final planning, bill of quantities, assisting in the awarding of electrical installation contracts and construction supervision

Medical Specialist Centre in Weimar
A part of the building at Goethe Platz 8 (old post) in Weimar was basically rehabilitated, reconstructed, fitted out and extended with a new building. After completion of the works the new building and large parts of the rehabilitated part is used as a medical specialist centre and the remaining areas for offices and apartments.
For this project, the electrical engineering design services for the installation of the complete electrical system in the TT- network, the external and internal lightning protection, a structured network as well as the exterior facilities according to work phases 1-8 after HOAI were provided.

Student union Jena-Weimar
Installation of data procession technology in student residences Schlegelstrasse 2 to 8

Planning services for fit out the buildings with a data network as well as new telecommunication and broadband cabling, including the coupling of the data network to the backbone network of the Friedrich-Schiller University of Jena. Each room received a data-, a broadband- and a telephone connection.
Work phases 1 to 8 according to HOAI

Rehabilitation National Gymnasium "Am Anger" in Jena and rebuilding of the administration building
Planning services for the installation of the entire electrical system, except the fire alarm- and burglar alarm systems
Work phases 1-8 according to HOAI

Jena city, Traffic planning- and civil engineering office, lighting of bus station Jena
Planning of the lighting for the stops, the traffic routes and the illumination of the facades and inscription at the new bus station
Work phases 2 and 3 according to HOAI

Friedrich-Schiller University of Jena – Fit out of student service centre
Planning services for renewal of the electrical system for the accommodation of the student service centre in the main university building
Work phases 2 to 8 according to HOAI

Jenawohnen GmbH - Reconstruction of the main power supply
Hanns-Eisler-Street 30 to 38 and Fichteplatz 7 to 9 in Jena
Planning services for the renewal of the main power supply, starting at the house connection box, via the metering box, rising electrical mains to the sub-distribution boards including potential equalisation
Work phases 4 to 8 according to HOAI

Fire damage GOT - Fire Restoration to Hall 1 Goeschwitz
Planning services for the electrical trade high- and low voltage current, fire alarm system, including lightning protection within the scope of restoring the utilisation condition of the building as a result of the fire incident GOT
Work phases 1-8 according to HOAI

Friedrich-Schiller University of Jena - In-house network Philosophen Weg 12 and Fraunhoferstrasse 6
Planning services for in-house wiring
Included is the copper network from the junction box at the workplace until the node cabinet, the passive components in the node cabinet as well as the low voltage wiring at the computer workstations.
Work phases 2 to 8 according to HOAI

New housing Wiesenstrasse in Jena
Planning services for the electrical trade for the reconstruction and rehabilitation of a former company building into apartments
Part of the contract was also the dismantling of an existing transformer station with all the associating problems
Work phases 3 to 7 according to HOAI

Jena city, Traffic planning- and civil engineering office, street lighting planning
Planning services for the extension of the existing street lighting in the Clara-Zetkin-Strasse, Am Rosenhang and Flurweg
Work phases 5 and 6 according to HOAI

Municipal real estate Jena - rehabilitation of sports hall Lobdeburg school
Planning for the electrical trade for a temporary building, dressing area as well as the ventilation system for the sports hall and fitness room
Work phases 1 to 9 according to HOAI

Friedrich-Schiller University of Jena - Computer pool, Helmholtzweg 4
Planning for the electrical trade for the installation of a computer pool with 21 computer workstations and a server room at the ground floor of the building
Work phases 2, 3 and 5 to 8 according to HOAI

Student Union Jena-Weimar - Basic rehabilitation at day-care-centre Seidelstrasse 3 in Jena
Project planning of the electrical installation and site supervision (low voltage- and lighting installation, small goods lift, smoke- and heat extraction system, intercom system, house telephony, telecommunication and burglar alarm system, emergency exit control)
Work phases 2 to 8 according to HOAI
Client is the Department of Construction in Gera

Friedrich-Schiller University of Jena - Relocation of NMR laboratories, Helmholtzweg 4
Planning for the electrical trade for reconstructing an extension to the building as a laboratory area for the installation of NMR equipment (spectrometer)
Work phases 3 and 5-8 according to HOAI

Renewal of level crossing gates at parking areas in Jena
Planning the electrical works within the renewal of two level crossing gates for parking spaces at the Friedrich-Schiller University of Jena
Insertion of a central system with parking management system, installation of traffic lights, intercoms, ticket readers, connection to the data network of the Friedrich-Schiller University
Work phases 2 to 8 according to HOAI

Friedrich-Schiller University of Jena - Conversion of laboratory "POLARIS", Fröbelstieg 3
Planning services in electrical trade (heavy- and low voltage current)
Planning of the electrical installation in compliance with high safety standards, lighting installation, access control, special security equipment, house-and fire alarm system, lightning protection, earthing, potential equalisation, structured network and telephone system
Work phases 1-8 according to HOAI

Friedenskirche of Jena - Reconstruction of the electric installation
Planning services for the renewal of the electric heating including its control, power distribution and a new house connection (TT- network) in compliance with aspects of historic preservation
Work phases 5, 6 and 8 according to HOAI

School youth hostel "Stern" Jena – Construction of hostel
Planning services in electrical trade (heavy-and low voltage current)
Net area about 900m2, handicapped accessible facilities, planning of the entire electrical system, fire alarm-, smoke and heat exhaust system, lightning protection and earthing installation, lighting and security lighting, outdoor lighting and connection to the telephone system in neighbouring building
Work phases 1-8 according to HOAI

Police departments in Thuringia - Police department Saalfeld
Engineering services in conjunction with the construction management
Evaluation of existing implementation planning, participation in site meetings with reprocessing, handling of problems with high voltage current technology, the low voltage current technology and building control
Work phase 8 according to HOAI

Friedrich-Schiller University of Jena - Laboratory Building Helmholtzweg 5 in Jena
Planning services for the rehabilitation of the laboratory for high precision quality measuring in electrical engineering trade, separation of usable areas in electrical engineering, data network and telephone system
Work phases 1-8 according to HOAI

Complete rehabilitation Am Anger 15 – Mayor’s office in 07743 Jena
Planning services in electrical engineering trade (heavy- and low voltage current)
It is especially notable that the telephone system of the municipality of Jena must remain in operation constantly.
Work phases 1 to 9 according to HOAI

Hotel extension Hotel "Zur Noll" - Oberlauengasse 20 in Jena
Planning services in electrical engineering trade (heavy- and low voltage current) in compliance with aspects of historic preservation
Work phases 2 to 8 according to HOAI

Police education and training centre – Construction of canteen Meiningen
Project planning of the electrical system (low voltage- and lighting system, smoke and heat exhaust system, locking device, intercom and structured network for telecommunication and data services), preparation of bill of quantities, examination of submitted quotations and issuing of contract proposals, construction management

Programming the EIB-system at the Polytechnic school Jena in the houses 1 & 2
Programming, parameterisation, commissioning and documentation of the EIB- system in training and office rooms, taking lecture times into account

Construction of GOEPEL electronic GmbH
Planning services in electrical engineering trade (heavy- and low voltage current) with the features of a high-tech electronics-manufacturing plant.
Project planning of the electrical system (low voltage- and lighting system, smoke and heat exhaust system, locking device, intercom and structured network for telecommunication and data services), preparation of bill of quantities, assistance in awarding of contracts, and partly construction management

Modernisation of electrical installation Town Hall Neustadt an der Orla
Planning services in electrical engineering trade / high voltage current (energy supply and lighting) and low voltage current (computer network, telephone- and alarm systems, etc.) for the reconstruction of the town hall and the cross connection for the building authority, work phases 2 to 8

Reconstruction of the Youth Centre EAST SIDE in Jena
Planning services in the electrical trade, communication and equipment in accordance with the requirements of a youth centre

EIB-system Latvijas Banka, Riga (Latvia)
Programming, parameterisation, commissioning and documentation of the EIB-system of a bank with the highest security relevant requirements

Judiciary Centre Jena
Draft planning and functional tender for the construction of a new judiciary centre, taking into account the special security relevant requirements

Rehabilitation Veterinary Clinic in Jena
Project planning of the electrical installation in the area of pathology, taking into account the characteristics and hygienic illumination of work areas (from 2,000 to 100,000 lux)

Police station Stadtroda
Project planning of the electrical installation for the reconstruction of the social area, including the entrance area

Construction of day-care centre "Himmelreich" Jena
Planning of the electrical installation, consisting of low-voltage- and lighting installation, smoke and heat exhaust system, intercom, house phone, telecommunication and burglar alarm system, sun-blind control

Renovation Villa Sonnenschein Jena
600m2 floor area, project planning of the complete electrical installation, taking into account high security relevant standards, preparation of the implementation planning and bill of quantities

Implementation planning new building Asclepion Meditec AG
Implementation planning and construction supervision (low voltage- and lighting installation, smoke and heat exhaust system, intercom, structured network for computing technology and telephone system, burglar alarm, emergency exit control)

Node Ammerbacher Strasse and Winzerlaer Strasse
Project planning of the street lighting, preparing the implementation planning and of the bill of quantities

EIB installation at sports hall Grete-Unrein School
17 bus interfaces; sun- blind control, lighting control via brightness sensor, time functions

FSU fire alarm system at August-Bebel-Strasse 2 Jena
Preparasion of planning services for the complete fire alarm system in a laboratory and classroom building with explosion- hazardous areas

Konrad-Zuse-Strasse 8, company Olpe
Planning services for a very large clean room area in the electrical trade with particular attention to an existing building, including low voltage current and construction management

Construction kindergarten Scharnhorststrasse Jena
Project planning of the electrical installation and supervision of construction (low voltage- and lighting installation, small goods lift, smoke- and heat exhaust system, intercom, house telephony, telecommunication and burglar alarm system, emergency exit control)

Implementation planning Polytechnic Remagen
Provision of planning services for the central areas of the polytechnic within 2nd building phase

Construction FiberCore Jena GmbH
Construction of a large industrial plant with a power input of 7 MW
Preparation of design services for electrical installations in the area of the whole high- and low voltage current range and building control

Reconstruction Prüssingstrase 41, Building 12
Reconstruction of a three- storey office building, planning services within electrical trade

Electricity supply and street lighting Kernbergviertel in Jena – 4th and 5th construction stage
Drafting the planning and preparation of the bill of quantities
Work phases 2 to 8 according to HOAI

External development Hospital 2000, in Jena-Lobeda
Node Ernst-Schneller-Strasse, node Paul-Schneider Strasse
Reconstruction of the intersection for unimpeded entry and exit of those having right of way
Planning services for the electrical installations for the adaptation of electrical installations to the new run of road

Friedrich-Schiller University of Jena – In-house-networks for colleges
Max-Wien-Platz 1, Fuerstengraben 1 (University main building), Froebel Stieg 1 (Abbeanum)
Project planning of the in-house wiring, including the node rooms and connection to the parent network

New building Jenoptik L. O. S.
Provision of engineering design services, preparation of the implementation planning including the low voltage main distribution board

Redevelopment and extension of Optical Museum Jena
Planning services for electrical installation, low voltage current technology, materials handling
Work phases 1-8 according to HOAI

Construction of Institute INNOVENT e. V. in Jena
Planning of the electrical- and lift installation
Work phases 1-8 according to HOAI

Planning of various telecommunication lines in Jena
Planning of telecommunication lines on behalf of municipal utility Jena GmbH in the city of Jena, at:
Ziegenhainer Strasse, Schulstrasse, Woellnitzer Strasse, Sellierstrasse, Carl Pulfrich-Strasse, Camburger Strasse, Schreckenbachweg, Schlippenstrasse, Clara-Zetkin-Straße/Spitzweidenweg, Kunitz, from substation Lobeda to substation Lobeda Goeschwitz, Tiefbrunnen Jena-Ost, TBG GWG - UW Goeschwitz, Drosselstraße, ZKA Kunitz

Neues Wohnen in Thuringia
Preparation of planning documents for the residential building Clara-Zetkin-Strasse 7-9, Camburger Strasse 5-13, Scharnhorststrasse 12 and 14 in Jena (total of 70 residential units) and Schlachthofstrasse/Bremer Straße, Teich-/Gruben-/Sulzestrasse and Liebknecht / Roentgenstrasse in Erfurt (a total of 405 residential units)

Timber-Framed-House Ellrich
Provision of design services for electrical installation including lighting, potential equalisation, telecommunication- and broadband cabling, sound-system wiring for historic buildings

Deconcentration of the industrial complex Goeschwitzer Strasse 20 in Jena
Distribution of low voltage system in all buildings, according to new utilisation

Construction of fire brigade depot in Jena
Planning of electrical installation work phases 1 to 3 and 5 to 8 according to HOAI

Deconstruction and extension of 3 eleven-storey panel system buildings in Jena
Planning of electrical installation Paul Schneider-Strasse 2, 4 and 6 in Jena
Work phases 2 to 8 according to HOAI

EIB-system Hans-Otto-house in Gera
Project planning, parameterization and commissioning of an EIB-system with about 400 users
Lighting control, sun-blind control, single room control for heating, brightness and timing control

Low voltage and medium voltage switchgear and transformer stations in construction 41 of the Schott GmbH Jena
Planning of the low voltage switchgear, the transformers and associated cable bridges in the work phases 1 to 8 according to HOAI

Power supply SICO Jena GmbH, Fore building 1st upper floor
Preparation of the implementation planning for the machine connections and the lighting
Work phases 3, 5, 6, 8, and 9 according to HOAI

Housing redevelopment in Weimar
Preparation of electrical project documentation for the rehabilitation and reinstallation of a residential building in Weimar, Rudolf-Breitscheid-Strasse 13, with 15 residential units

IMB new building in Jena
Compilation of the documentation for the electrical installation, producing the bill of quantities and the implementation planning of the electrical system for the new administration building, programming of the EIB- system with about 70 users

Imaginata e. V. Jena
Electrical design for the 30-kV switchgear building
Work phases 1 to 9 according to HOAI

Integrative day-car-centre at Kochstrasse 4 in Jena
Project planning for the electrical installation and supervision of construction (low voltage- and lighting installation, passenger lift, smoke and heat exhaust system, locking system, intercom, house telephony, and broadband telecommunication system)

Apartment rehabilitation from the Municipal residential and administrative company Jena
Preparation of electrical project documentation for the renovation and reinstallation of electrical installations of residential buildings in Jena, Erich Weinert Strasse, Eschenplatz, Loebichauer Strasse, Leipziger Strasse, Camburger Strasse, An der Trebe, Robert-Blum Strasse, Schuetzenhofstrasse, Luther Strasse 167 - 203 (113 residential units), Naumburger Strasse 5-9,  Am Hang 9-13 and Am Hang 10-14, Karl-Liebknecht Strasse 39, Gartenstrasse 8, Naumburger Strasse 37, Clara-Zetkin-Strasse, Riedstrasse 4, Talstrasse 7 and 9a, Lobdeburgweg 6, Ebereschenstrasse 16, 18, 20, Tuemplingstrasse 3-9, Kunitzer-Strasse 12, 12a, 12b, Ernst-Schneller-Strasse 2 and 4, Schlippenstrasse 9, Semmelweisstrasse 19, Robert Blum Strasse and in Drackendorfer Weg 2-6

Street lighting Kernbergviertel Jena
Project planning of street lighting with about 330 light points

Redevelopment Frommannsches Haus in Jena
Reinstallation of the electrical system of a building complex with consideration of preservation of historic buildings

Electrical supply of the Kernbergviertel in Jena
Extensive reconstruction of the supply network (low voltage network, medium voltage network with transformer stations) for approximately 3,500 households

Residential and commercial building "Oelmuehle" in Jena
Compilation of the electrical-project documentation for the residential and commercial building in Jena

New building Promera, Saalepark Jena
Compilation of the electrical-project documentation for the entire building under construction, consisting of light-, power- and telephone installation as well as the interior and exterior lightning protection.
The power supply is accomplished by 3 transformers with a capacity of 800 kVA each.


Aktuelles